The administrative fine of 8.39 million TL imposed on İSKİ by the Ministry of Environment on 12 August 2026 was the third sanction in just the past year. The figures show that the Ambarlı case is not an isolated operational error; it is the natural result of a hydraulic capacity crisis.
plant capacity
bypass flow rate
(estimated)
current fine
Chronology and Trend Analysis of the Fines
Although only 15 months passed between the three penalties issued to the Ambarlı facility, the penalty amount increased by more than twofold. This indicates that the deterrent effect of penalties is weaker than their effect on eliminating the problem.
One-year increase rate: 151%. Even if the penalties multiply, as long as the facility's physical capacity does not change, the data confirm that sanctions do not alter behavior.
What does 100,000 cubic meters mean?
100,000 cubic meters of wastewater per day means the equivalent of 6,666 vacuum trucks with a standard capacity of 15 cubic meters being discharged into the Marmara Sea. On an annual basis, this figure reaches 36.5 million cubic meters — a volume roughly equal to about 10% of a medium-sized dam reservoir.
36.5 million m³ of untreated wastewater per year — this is equivalent to approximately 40% of the water volume of Küçükçekmece Lake. It is discharged directly into the receiving environment.
Source of the problem: Hydraulic load and sludge accumulation
Conventional advanced biological treatment plants either lose treatment efficiency or bring the bypass line into operation once the hydraulic load exceeds nominal capacity. The bypass ratio at the Ambarlı facility being at 25% indicates that capacity must be expanded by at least 30%.
The time required to carry out this expansion using the conventional method is 24–36 months. Over this period, the penalty amount — with the 70% annual increase trend — may exceed the facility's initial investment cost. Modular and carbonizing drying-based additional units can be put into operation within 6–9 months.
Hydraulic Load Management with Carbonized Drying
The reactor-top carbonizing drying system developed by Stinga Enerji enables the wet sludge generated at the final stage of the wastewater treatment process to be carbonized in an oxygen-free environment. This produces two simultaneous outcomes:
| Parameter | Conventional Disposal | Carbonized Drying |
|---|---|---|
| Sludge volume (after input) | 100% | 10–20% |
| Moisture content | %75–80 | Under 5% |
| Disposal energy requirement | Additional fuel required | Autocatalysis (net energy generation) |
| Output product | Storage waste | Alternative fuel for cement plants |
| Emissions | CO, NOx, VOC risk | Near-zero volatile emissions (oxygen-free) |
| Installation time | 24–36 months | 6–9 months (modular) |
Source: Stinga Enerji A.Ş. R&D data; measurement reports from TÜBİTAK and ENKA Laboratory.
Expanding capacity does.