TR TR
Stinga Enerji A.Ş.
R&D
SYS:STINGA-ARGE-LAB
STATUS:ACTIVE
VER:2024.18
LAT:41.0082°N
LNG:28.9784°E
İSTANBUL/TR
▶ RESEARCH AND DEVELOPMENT
SYS · STINGA ENERJİ R&D CENTER · ACTIVE

R&D—
R&D

18 Years of Scientific Excellence
18
YEAR / R&D
5
FIELD FACILITY
134
COUNTRY / PATENT
%97
COMBUSTION EFFICIENCY
01
R&D Focus Areas
🔬

Zero-Emission Combustion Technology

Development of a combustion process that reduces CO, SO₂ and NOx values to near-zero levels. Verified by ENKA independent laboratory tests.

01
⚗️

Coal Enrichment Process

Moisture reduction technology from 55% to 5%. Every 1% decrease in moisture provides a 50 Calorie increase. TKİ accreditation has been obtained.

02
🏗️

Drying System Design

Oxygen-free carbonizing drying method. Single-deck and double-deck drying systems are applied on an industrial scale.

03
⚡

Reactor Technology

Stinga 4D Rotary Kiln Reactor: gasification combustion system. High-temperature reactors and reactor-top drying integration.

04
♻️

Waste Disposal Systems

The conversion of sewage sludge, animal, and industrial waste into energy. Reducing 75% moisture material to 5% in a single pass.

05
🌍

Universal Fuel Research

Active work on converting any material with combustibility in nature, including bituminous shales, into economical fuel.

06
Stinga AR-GE Tesisi

Four machines, one raw material: sewage sludge

Single-deck, double-deck, Q1500 and the activated carbon unit are operating on the same site. The two films tell the same facility from two different angles: one follows a day from dawn to dusk, the other a night while the city sleeps.

%75 → %1 moisture900 °C hot gas134 countries patent
Stinga R&D Facility, THE ONE DAY film 4:17

ONE DAY 4 min 17 sec

From dawn to dusk, each machine one by one: ground and aerial shots, SCADA screens in the control room, and field cameras.

Stinga R&D Facility, NIGHT SHIFT film 3:10

NIGHT SHIFT 3 min 10 sec

Through the eyes of a guard from dusk to dawn: the reactor’s fire, rotary kiln, loaders, and a night with no waste left by morning.

Field R&D Activities

5 FACILITIES · 2006—2024
2006
Istanbul Kemerburgaz Facility
Istanbul — Kemerburgaz

5 Ton/Hour Capacity
Coal Washing & Drying & Packaging Plant

The first commercial application of Stinga Technology. In a coal mine operation, successful commercial operation was carried out continuously for 2 years at a capacity of 5 ton/hour.

5 TONS/HOUR 2 YEARS COMMERCIAL FIRST APPLICATION
2008
Merzifon Facility
Amasya — Merzifon

10 Ton/Hour Capacity
Coal Enrichment Plant

By doubling the capacity, commercial production continued for 2 years at 10 ton/hour in the Merzifon coal mine operation. The scalability of the technology has been proven.

10 TONS/HOUR 2 YEARS COMMERCIAL SCALING
2010
Denizli Facility
Denizli — Tavas

20 Ton/Hour Capacity
Coal Enrichment Plant

The largest field plant operating commercially for 4 years. Capacity to reduce moisture from 55% to 5% increased the calorific value from 1700 to 4200 Calorie.

▶ TKİ — Türkiye Coal Enterprises experts conducted a 3-day accredited test on site. Ilgın and Seyitömer Laboratories officially validated the technology.

20 TONS/HOUR 4 YEARS COMMERCIAL TKİ APPROVED
EÜAŞ
EÜAŞ Workshop Presentation
Meeting with the Director of Thermal Power Plants Department at EÜAŞ
Kuşadası — Workshop Presentation

Türkiye Electricity Generation Co.
Stinga Enerji A.Ş. Workshop Presentation

Two expert engineers from EÜAŞ Headquarters and three expert engineers from Çan Thermal Power Plant personally inspected the Denizli facility and confirmed the TKİ report.

▶ At the workshop presentation, EÜAŞ officials accepted the suitability of Stinga Technology for thermal power plant applications.

EÜAŞ APPROVAL OFFICIAL REGISTRATION THERMAL POWER PLANT
CHINA
DELEGATION
China Delegation Visit to Denizli
Denizli — International Visit

China State-Owned Company &
Austria Commercial Attaché Delegation

Representatives of a China state-owned company and the Austria Commercial Attaché visited the Denizli facility. International licensing requests came to the agenda; discussions are ongoing.

Domestic industrial companies showed strong demand; since the existing production capacity could meet the needs of only two factories, a decision was made to invest in Çorum.

INTERNATIONAL LICENSE REQUEST ÇORUM INVESTMENT
03
Active R&D Activities
In Development Phase

Next-Generation Reactor Designs

Next-generation reactors, an advanced version of the Stinga 4D architecture, are being designed with higher capacity and lower installation cost.

PROGRESS%72
In Testing Phase

Single-Deck Drying Systems

Single-drum drying units in which the reactor and rotary kiln operate as a single system. Designed for remote coal mines and small-scale industrial enterprises.

PROGRESS%85
At Pilot Site

Industrial Disposal Solutions

Integrated disposal systems where sewage sludge and industrial waste are combined with energy production. 75% moisture is reduced to 5% in a single pass.

PROGRESS%60
In Research Phase

Activated Carbon Production Optimization

Studies on the optimization and scaling of the high-purity activated carbon production process using Stinga reactor infrastructure.

PROGRESS%45
// RESEARCH & DEVELOPMENT · STINGA ENERJİ

SCIENCE
DOES NOT STOP

18 years of accumulation · patent registration in 134 countries · ongoing innovation
Audio Reading
0:00 --:--
Speed:
01 / 01
⬇
AI
Our Services
Industrial Machine
Activated Carbon
Mining
Coal Drying
Wood Chips Drying
Bentonite Drying
Sewage Sludge Disposal
Poultry
Residential Heating