POYRALI VILLAGE
41°52′N 27°21′E
LICENSE STAGE: OPERATION
END: 30.11.2036
Stinga
Mining
Lignite coal and clay mining activities carried out in Poyralı village, Pınarhisar district of Kırklareli province. Raw coal enriched with Stinga Technology and production of cement raw material.
From Poyralı
to the World
Energy
Stinga Enerji A.Ş. extracts raw lignite coal and clay in Kırklareli's Pınarhisar district with many years of mining experience. The extracted coal is not only left as a raw material, but is enriched with Stinga Technology to become high-calorific and low-moisture fuel.
"By reducing the moisture content of raw coal from 55% to 5%, we increase its calorific value from 1,700 to 4,200 kcal/kg."
All activities are carried out in full compliance with environmental regulations, within the framework of licenses and permits approved by the General Directorate of Mining and Petroleum Affairs (MAPEG).
Clay
Mining
Clay extracted from the Poyralı site is one of the main raw materials of the cement industry. The chemical analysis of samples taken in the 2022 drilling campaign shows that the clay at the site offers different profiles suitable for sectors such as cement and ceramics.
Sample
SK3–SK8
Depth
Area
Poyralı Clay
Chemical Analysis
Main oxide ranges measured in 30 samples taken from boreholes at depths of 0–43 m.
The wide CaO and Na₂O range shows that clay batches suitable for different sectors can be prepared through selective excavation and blending. Product class is determined for each batch by laboratory analysis.
Cement Raw Material
With a content of 42–61% SiO₂ and 10–18% Al₂O₃, it is used as a source of silica and alumina in clinker production.
Variable CaO Profile
In samples, CaO varies between 0.07% and 19.6%; calcareous (marly) and low-calcium clay batches can be prepared separately.
Ceramics & Brick Candidate
Alumina and iron oxide levels are evaluated for brick, tile and ceramic applications; suitability is determined by laboratory testing.
Selective Excavation
Different clay profiles are found at different depths; selective excavation and blending are used to prepare batches in accordance with customer requirements.
Classification by Analysis
Each batch is shipped after classification through main oxide (SiO₂, Al₂O₃, Fe₂O₃, CaO) analysis.
Natural Mineral
A natural raw material without additives; clay extracted from the site is processed and delivered directly to industry.
Where Used?
Cement
Source of silica and alumina in clinker production; clay component in the raw meal blend.
Brick & Tile
Clay raw material for fired clay building materials.
Ceramic
Batches in the appropriate profile are used in ceramic bodies.
Fill & Infrastructure
Used as clay material in geotechnical fill and infrastructure works.
Extraction Site
From the Poyralı site by selective extraction method
Quality Analysis
Main oxide analysis of SiO₂, Al₂O₃, CaO and Fe₂O₃
Drying
Preparation for processing by optimizing moisture content
Grinding & Screening
Granulometry Adjustment by Sector
Packaging & Shipping
Delivery to the customer as big-bag or bulk
Stinga systems in clay drying
Moist clay can be brought to the desired moisture content before grinding and screening with drying systems designed and manufactured by Stinga. The same systems are installed for clay and bentonite producers.
Clay and bentonite drying systems →From Raw
to High-Efficiency
Fuel
Raw Coal Extraction
Lignite coal extracted from the Poyralı site; contains high moisture (55%+) and low calorific value (≈1,700 kcal/kg).
Drying in the Stinga Reactor
Raw coal is fed into the Stinga 4D Reactor system. Moisture is reduced to 5% through thermal drying in an oxygen-free environment.
Calorific Value Enrichment
Each 1% reduction in moisture provides an increase of ≈50 kcal/kg. The total calorimetric value reaches 1,700 to 4,200 kcal/kg.
Combustion with Near-Zero Emissions
The enriched coal is burned in Stinga emission systems. SO₂ ≈0, CO and NOx are far below the legal limit.
Stinga Enerji A.Ş. · Site Introduction Video



License &
Permit Documents
The Poyralı site has a Group IV operating license and lignite operating permit in the name of Stinga Enerji with documents dated 17.02.2026 from the General Directorate of Mining and Petroleum Affairs (MAPEG).

MAPEG Approved
Enlarge document ⤢Lignite — MAPEG Approved
Enlarge document ⤢Poyralı Site














Environment &
Regulatory Compliance
The mining license area was marked on site with a surveying measurement. The plan map shows the corner points of the area and elevation values between 313–320 m.

MAPEG Operating License
The Group IV Operating License issued by the General Directorate of Mining and Petroleum Affairs is active.
EIA Out-of-Scope Decision
It has been confirmed by the Kırklareli Governorship Provincial Directorate of Environment and Forestry that it is outside the scope of the EIA.
Forest Permit
Mining operation and infrastructure facility permission has been obtained from the Istanbul Regional Directorate of Forestry for an area of 56,621.82 m².
Workplace Opening License
Class 2 Workplace Opening and Operating License is available from the Kırklareli Special Provincial Administration.
Non-Hygienic Establishment Permit
A GSM permit has been obtained from the Kırklareli Special Provincial Administration Environmental Protection Directorate for an area of 6.06 hectares.
Near-Zero Emissions
Coal extracted is processed with Stinga technology and burned with SO₂ ≈0, CO 12 ppm, NOx 3 ppm.
From the
Depths of the
Earth
Contact our team for technical information, license details, or cooperation opportunities regarding our lignite and clay mining activities in the Poyralı site of Kırklareli.