Ministry of Environment, Urbanization and Climate Change of the Republic of Türkiye
Istanbul Water and Sewerage Administration General Directorate
We appreciate the administrative fine of TRY 8,391,000 imposed on the Ambarlı Advanced Biological Wastewater Treatment Plant, as announced in your Ministry's statement of August 12, 2026. However, this is the third sanction applied to the same plant within 15 months, and it is clear that the problem will be solved not by penalties but by increasing technical capacity.
This letter has been prepared by Stinga Enerji A.Ş. to present our domestic and national technology, which can offer a lasting solution to the hydraulic load crisis in Ambarlı and similar facilities, to your attention.
Technical summary of the problem
As identified in your Ministry's report:
- The nominal capacity of the Ambarlı facility is 400,000 m³/day.
- An estimated 100.000 m³/day of untreated wastewater is discharged into the receiving environment from the bypass line.
- The source of the problem has been identified as "insufficient capacity of the wastewater treatment plant."
In the conventional biological treatment process, the resulting wet sewage sludge both increases the plant's hydraulic load and creates a waste stream that must be disposed of. The simultaneous reduction of these two loads leads to an expansion of capacity.
Our Recommendation: Reactor-Top Carbonizing Drying System
At the end of our company's 18-year R&D process, the reactor-top carbonizing drying technology developed and protected by patents in 134 countries carbonizes sewage sludge in an oxygen-free environment by:
- Reduces sludge volume by 80–90%,
- Reduces moisture content to 5%,
- The resulting solid product is converted into a high-calorific alternative fuel and is supplied as fuel to cement plants; in this way, it reduces fossil fuel consumption and lowers the carbon footprint,
- Because it operates the process in an oxygen-free environment, it keeps volatile organic emissions at a minimum level,
- Because it is modular, it can be integrated into the existing facility within 6–9 months.
The direct result of this integration is the reduction of the treatment plant's effective hydraulic load and the maintenance of effluent quality within standards without the need for a bypass line.
The fastest way to expand capacity is to reduce the sludge load at the source.
Verified technology, independent validation
Our technology has been tested by the following independent institutions and laboratories, and the measurement reports have been officially published:
Our Call
The Ambarlı case is a concrete indicator of a structural gap in Türkiye's treatment infrastructure. The pollution load of the Sea of Marmara is critically important not only for Istanbul, but also for the tourism, fisheries, and ecosystem of the surrounding provinces.
Our call to your Ministry and the İSKİ General Directorate is as follows: If a pilot implementation site is allocated for the domestic technology developed by our company, we are ready to undertake on-site measurement, installation, and verification processes with our own engineering teams. Upon request, a detailed technical dossier, reference list, and feasibility study will be provided.
We expect you to take the opportunity to jointly demonstrate the maturity achieved by domestic industry in the field of environmental technology in solving our country's most visible ecological crisis.
Contact: For your request for a technical dossier for Ambarlı and similar cases, you can reach us through our contact form.