TR TR
Stinga Enerji A.Ş.
Stinga Technology · Tender No. K.7/3-261

Coal Drying
and Enrichment
Plant

A fundamental efficiency transformation to be carried out with Stinga Technology, patented in 134 countries, reducing daily coal consumption at Kangal Thermal Power Plant from 22,000 tons to 7,000 tons while maintaining the same 450 MW electricity generation.

457 MW
Installed Capacity
%68
Coal Savings
3.300
Target kCal/kg
50 YEAR
Reserve Life
86M $
Annual Savings
3 Units · 2×150 MW + 1×157 MW
200 tons/hour KKZ Capacity
134 Countries Patent Registration
Kangal / Sivas · Altitude 1,540 m
Visit: 31.01.2017
01
Scope of Work

Project Background and General System Overview

Following receipt of the tender invitation for Coal Drying and Enrichment Facility no. K.7/3-261 dated 17.01.2017, the Kangal Thermal Power Plant was visited on 31.01.2017; an on-site meeting was held with General Manager and Mechanical Maintenance Manager M. Türker Dursun.

At the on-site inspection, it was determined that the plant consumes 22,000 tons of coal per day. Stinga Technology dries coal with a 50% scale savings, at a capacity of 11,000 tons/day; it becomes possible to produce 7,000 tons/day, for a total of 457 MW from coal reduced from 48% moisture to 3% moisture.

🏭

1.1 — System Description

Kangal Thermal Power Plant consists of 3 units with a gross installed capacity of 457 MW (2×150 MW + 1×157 MW). At full load operation, hourly coal consumption is approximately 900 tons/hour. The project's primary objective is to raise the coal calorific value to the design value. In addition, reducing the ESP and FGD inlet gas temperatures is expected to lower FGD investment and operating costs.

🎯

Project Scope

It is planned to increase the coal calorific value before the mill to the design value of 1,100 kCal/kg, reduce calorific fluctuations, and enrich and use the very low-calorific coal in the mine reserve that is planned to be used in the near future for electricity generation.

02
Current Status and Issues

Current Plant Performance Issues

🔥

1.2 — Calorific Value

The lower heating value of the coal currently burned is an average of 1,050 kCal/kg, below the design value of 1,100 kCal/kg. With the KKZ system, the lower heating value will be brought to the design limits, increasing unit availability and capacity utilization rates.

🛢️

1.3 — Auxiliary Fuel

The low lower heating value of coal and the large variability in calorific value make auxiliary fuel supplementation mandatory in boilers. With KKZ, by homogenizing the coal heating value, the need for auxiliary fuel will be minimized.

🌡️

2.3 — ESP Gas Temperature

The gas temperature before the ESP is 195°C, which is above the design value of 160°C. This exceedance significantly reduces dust collection efficiency. KKZ will remove heat from the gas duct and reduce the ESP temperature to 160°C.

⚗️

2.4 — FGD Gas Temperature

The FGD gas inlet temperature is currently 195°C. With the KKZ installation, this value will be reduced to 120°C, thereby significantly lowering the FGD investment cost. There will be no need for the atomized water spraying method.

⛏️

2.5 — Low-Calorie Reserves

In the existing coal field, there is a low-calorific lignite reserve of approximately 13,837,000 tons, with an average calorific value of 512 kCal/kg and above. With 200 tons/hour KKZ, this coal will be raised to 1,350 kCal/kg; by blending with mine coal, an average of 1,150 kCal/kg will be obtained at the boiler inlet. In this way, both the low-quality reserve will be utilized and the plant will be able to generate power with its own reserve for a longer period.

📉

2.6 — Inability to Reach Full Load

Due to the low calorific value and instantaneous fluctuations, the boilers cannot reach full load. The plant is producing approximately 410 MW instead of 450 MW (approximately 9% loss, 40 MW/hour). After KKZ, with the improvement in coal properties, the boilers will be able to operate continuously at full load; the unit electricity generation cost will decrease.

03
Sections 3 & 4 — Stinga Technology

Technical Details and the Difference of Stinga Technology

Plant Technical Parameters

ParameterUnitUnit 1Unit 2Unit 3
CapacityMW150150157
Gas Temperature after Economizer°C308
Gas Temperature before ESP (Current)°C195
Gas Temperature after ESP°C195
Gas Temperature before FGD (Target)°C120
Gas Flow RateN.m³/h1.100.000
Lignite Moisture Content%48–52
Lower Calorific Value RangekCal/kg900–1.300
Altitudem1.540
Ambient Temperature Range°C−25 / +35

KKZ Technical Specification Items (3.1 – 3.9)

  • 3.1A total 200 tons/hour capacity KKZ plant will be installed by Stinga at Kangal Thermal Power Plant.
  • 3.2All of the thermal energy to be used in the KKZ system will be taken via heat exchangers from the stack gas ducts. Stack gas will not be used directly in KKZ; only its thermal energy will be utilized. The design of the heat exchangers and their integration into the Stinga unit boilers are the responsibility of the contractor.
  • 3.3The circulating fluid system that enables heat exchange between the heat exchangers installed in the unit gas ducts and the KKZ system (piping, pumps, and the entire system) is the responsibility of the contractor Stinga.
  • 3.4Additional pressure losses arising from the KKZ heat exchangers to be placed in the gas channels will be calculated by the contractor and provided to Kangal Thermal Power Plant.
  • 3.5In KKZ, 200 tons per hour of coal to be enriched will be taken after the main crusher. The particle size after the existing crusher is 0–30 mm. If further reduction in particle size is required, the additional crusher is the responsibility of the contractor.
  • 3.6After enrichment, the coal will be discharged onto the two main conveyors in equal amounts or, as selected, into either one. Low-calorific pit coal and enriched coal will be blended homogeneously.
  • 3.7The main belts are taken out of service for 2–2.5 hours in each shift. To ensure uninterrupted operation of KKZ during this period, KKZ balancing/storage bunkers before and after will be designed and installed by the contractor.
  • 3.8To prevent volatile matter from being lost, the coal temperature will not exceed 80°C during the drying process. In Stinga pilot studies, it was observed that volatile gases did not decrease; on the contrary, they increased proportionally with moisture uptake (See Appendix-2, Table 4).
  • 3.9In the design and installation of the KKZ system and auxiliary systems, the geographical location, elevation, and unit operating conditions of Kangal Thermal Power Plant will be taken as the basis.

Specification target: with 200 tons/hour KKZ, remove the 10% moisture in coal to achieve a 300 kCal/kg increase; blend the 200 tons/hour processed coal with the remaining 716 tons/hour to increase the calorific value of all coal by 90–100 kCal/kg. With Stinga Technology, this target is far exceeded, achieving 45% moisture removal and a 2,250 kCal/kg increase.

The Difference and Benefits of Stinga Technology (Section 4)

  • ›Stinga technology has been patented in 134 countries. Existing drying technologies can remove a maximum of 10% moisture; they can provide only a 30 kCal/kg calorific value increase for each point of moisture.
  • ›Stinga dries young coal in an oxygen-free environment and carbonizes it; for each point of moisture uptake, a 50 kCal/kg calorific increase is achieved (67% above conventional systems).
  • ›In existing KKZ technologies, coal can regain moisture during the waiting period after maximum drying. With Stinga, moisture reduction from 55% moisture level to 0% is possible.
  • ›For a coal with 5% inherent moisture, it is recommended to reduce this value to 3%. If reduced to zero, it will rise again to 5% from ambient moisture. This situation was reported through TÜBİTAK MAM – Gebze Technical University studies (Appendix-1).
  • ›Coal whose moisture content is reduced below the inherent moisture does not exceed its inherent moisture value again even if exposed to water outside.
  • ›Each Stinga unit has an inlet capacity of 40 tons/hour wet coal. Low-quality lignite is further carbonized.
  • ›To remove the 45% inherent moisture, the coal dried in the rotary kiln is burned at 3% to obtain thermal energy. 900°C stack gas is sent to the rotary kiln, and the system operates continuously.
  • ›The heat taken from the FGD inlet is used as combustion air for Stinga combustion boilers and as additional heat for the rotary kiln, and the 3% fuel consumption of the dried coal is also reduced.

Stinga vs. Conventional

Max. Moisture Uptake (Conv.)%10
Max. Moisture Uptake (Stinga)%55 → %0
Calorie Increase/Point (Conv.)30 kCal/kg
Calorie Increase/Point (Stinga)50 kCal/kg
Drying MethodOxygen-free
Coal Max. Temperature135°C
Target Lower Heating Value3,200–3,300 kCal/kg
Number of Patent Countries134 Countries
Coal Moisture ReabsorptionNo
Volatile Gas PreservationYes (Increases)
04
Section 5 — Contributions

Stinga's Contributions to the Plant (5.1–5.6)

5.1 — Increasing the Calorific Value of Coal

The 48% moisture of average 1.050 kCal/kg coal will be reduced to 3% by removing 45% of the inherent moisture. Thanks to drying in an oxygen-free environment, a 50 kCal/kg increase is achieved with each point of moisture removal.

Calorific Value Calculation: 50 kCal/kg × 45% moisture = 2.250 kCal/kg increase

Pit coal: 1.050 kCal/kg + Drying increase: 2.250 kCal/kg = ≈ 3.200–3.300 kCal/kg target

Daily conversion: 22.000.000 kg/day × 1.050 kCal/kg = 23.100.000.000 kCal/day ÷ 3.300 kCal/kg = the same calorific value requirement is met with 7.000 tons/day.

In summary: at the existing plant, 22,000 tons/day of 1,050 kCal coal are burned to produce 450 MW. With Stinga, the same 450 MW will be produced with 7,000 tons/day of 3,300 kCal coal.

To produce 7.000 tons/day of coal, 12.750 tons/day will be extracted from the pit and 45% moisture will be removed; the daily coal savings will be 9.250 tons/day.

Existing — Table 1
Original System
Daily Coal22,000 tons/day
Lower Heating Value1,050 kCal/kg
Moisture Content55% (or 48%)
Ton/Hour916,7
Thermal Power1.119 MW
Production~410 MW
Calories for 1 kW2.139 kCal
Plant Efficiency%40,21
Boiler Efficiency%80
Actual Efficiency%32,17
With Stinga — Table 1
New System
Daily Coal7,000 tons/day
Lower Heating Value3,300 kCal/kg
Moisture Content%3
Ton/Hour291,7
Thermal Power1.119 MW
Production450 MW (Full)
Calories for 1 kW2.139 kCal
Plant Efficiency%40,21
Boiler Efficiency%93
Actual Efficiency%37,39

5.2 — Reducing Auxiliary Fuel Usage

Although the plant's design value is 1,100 kCal/kg, the average calorific value of the coal burned is 1,050 kCal/kg. To offset this deficiency, auxiliary fuel supplementation becomes mandatory. At a daily consumption of 22,000,000 kg, a 100 kCal/kg supplementation requirement = 2,200,000,000 kCal/day additional caloric energy is needed. This requirement can be met with 440 tons/day of imported coal at 5,000 kCal/kg.

Imported coal price: 110 $/ton | Kangal coal equivalent cost: 21,6 $/ton

Difference: 88,4 $/ton × 440 tons/day = 38.896 $/day × 365 = 14.197.040 $/year additional cost

With Stinga Technology, this auxiliary fuel requirement is completely eliminated.

5.3 — Increasing ESP Dust Collection Efficiency

By reducing the gas temperature before the ESP from 195°C to the design value of 160°C, energy and water savings will be achieved for the temperature reduction at the FGD plant inlet. Stinga Technology transfers the heat taken from the gas temperature before the ESP as additional heat to the Stinga boiler-furnace combustion air and rotary dryer system, improving ESP performance while also reducing its own coal consumption.

5.4 — Reducing FGD Inlet Gas Temperature

The designed FGD gas inlet temperature is 195°C. With the Stinga KKZ system, this value is reduced to 150°C. The heat energy obtained here is transferred to the rotary dryer kiln, reducing the consumption of Stinga's 3% dried coal. Waste heat is utilized before the FGD, preventing unnecessary water and energy consumption.

5.5 — Utilizing Low-Calorific Lignite Reserves

With a 200 tons/hour KKZ plant, the goal is to reach 1,350 kCal/kg from the existing 1,050 kCal/kg coal by removing 10% moisture. Within the 22,000 tons/day consumption, 4,800 tons/day of coal will be dried and raised to 1,350 kCal/kg; the remaining 716 tons/hour will be blended with 1,050 kCal/kg mine coal to obtain an average of 1,100 kCal/kg (design value) at the boiler inlet. In this way, the low-quality lignite reserve will also be included in the system, making it possible for the plant to generate power with its own reserve for a longer period.

5.6 — Units Reaching Full Load and Advantages

Currently, the plant produces approximately 410 MW instead of 450 MW (9% loss, 40 MW/hour shortfall). This also increases the unit cost of electricity generation. With Stinga, as the calorific value increases from 1,050 kCal/kg to 3,200–3,300 kCal/kg, it will be well above the critical lower calorific value; the plant will be able to operate continuously at a maximum of 450 MW, and production interruptions and shutdowns will not occur.

05
Section 6 — Advantages

8 Advantages Provided by Stinga Technology

1

Combustion Air Savings — 3.5% Coal Savings

To burn 22,000 tons of coal: 22,000,000 kg × 5 m³ = 110,000,000 m³/day air. With Stinga, for 7,000 tons: 7,000,000 × 5 m³ = 35,000,000 m³/day. Thanks to the 75,000,000 m³ savings, 3.5% less coal is used.

770 tons/day × 16 TL/ton = 12.320 TL/day × 365 = 4.496.800 TL/year SAVINGS
2

Boiler-Internal Moisture Evaporation Savings — 4,5% Coal Savings

Due to the 48% moisture of the existing 22,000 tons of coal, the amount of water taken is 405 tons/day; in the boiler, this water is vaporized using 323,635,200 kCal/kg. With Stinga, by removing 45% moisture, the remaining 3% moisture will be only 8,750 kg and will evaporate in the boiler. A 4.5% coal saving is achieved.

990 tons/day × 16 TL/ton = 15.540 TL/day × 365 = 5.781.600 TL/year SAVINGS
3

Hot Coal Efficiency Increase — 9.44% Additional Efficiency

Each 25°C increase in coal temperature provides a 2% efficiency gain. Stinga dries at 135°C; accordingly, an additional 9.44% efficiency gain or an equivalent reduction in coal use is anticipated. The specification required that coal temperature not exceed 80°C; however, in all of Stinga's pilot and industrial studies, volatile gases were not reduced, but rather increased with moisture removal (ANNEX-2).

4

Reduction in Internal Electricity Consumption — An Additional 29,25 MW Ready for Sale

When 4,900 tons of coal are burned instead of 22,000 tons, system load decreases and internal electricity consumption falls from 13% to 6.5%. As a result, an additional 29.25 MW of electricity can be offered for sale.

702.000 kW/hour × 0,075 cent = 52.650 $/day × 365 = 8.000.000 $/year SAVINGS
5

Decrease in Ash Content

22.000 tons of coal contains 25% ash → 5.500 tons/day ash. The transportation and storage of this ash creates significant cost. This is also an important savings item.

6

Decrease in Ash Transfer and Stockpiling Cost

Although the ash ratio is 35% when 4.900 tons of dried coal are burned, this corresponds to only 1.715 tons/day. Ash transfer and storage costs will decrease significantly.

7

Reduction of Emission Values

While 110,000,000 m³ of air is used for 22,000 tons, only 24,500,000 m³ of air is required for 4,900 tons of coal. Emission values will decrease in direct proportion to this ratio. In addition, while 35,000,000 m³ of air is used for 7,000 tons/day in Table 1, with additional savings, 1% less coal is used in coal combustion at 4,900 tons/day.

228 tons/day × 365 = 83.220 tons × 16 TL/ton = 1.331.328 TL/year SAVINGS
8

Total Coal Savings and Reserve Extension

Along with all advantages, to obtain 4.900 tons/day of 3% moisture coal, it is sufficient to extract only 8.800 tons/day of coal from the pit.

22.000 − 8.800 = 13.200 tons/day × 365 = 4.818.000 tons/year coal savings
4.818.000 tons × 16 TL/ton = 77.088.000 TL/year coal savings
Coal reserve life will increase from 20 years to 50 years.
06
Table 2, 3 & 4

Table of Total Savings to be Achieved with Stinga Technology

Table 2 — Advanced Scenario: Operation with 4,900 Tons/Day

7,000 Tons/Day Scenario
Table 2 — Scenario A
Daily Coal7,000 tons/day
Lower Heating Value3,300 kCal/kg
Ton/Hour292
kgCal/h962.500.000
Thermal Power1.119 MW
Production450 MW
Calories for 1 kW2.139 kCal
Plant Efficiency%40,21
Boiler Efficiency%80
Actual Efficiency%32,17
4,900 Tons/Day Scenario
Table 2 — Scenario B (Optimum)
Daily Coal4,900 tons/day
Lower Heating Value3,300 kCal/kg
Ton/Hour204
kgCal/h673.750.000
Thermal Power783 MW
Production450 MW
Calories for 1 kW1.497 kCal
Plant Efficiency%57,44
Boiler Efficiency%93
Actual Efficiency%53,42

Table 3 — Coal Savings Table

Savings Item%Ton/DayTon/Year$/Day$/Year
5.2 — Reducing Auxiliary Fuel Usage—440160.60038.89614.197.040
Advantage 1 — Reduction in Combustion Air%3,50770281.0503.2451.183.368
Advantage 2 — Boiler Moisture Evaporation%4,50990361.3504.0891.492.474
Advantage 3 — Increased Hot Coal Efficiency%9,442.076757.7698.7413.190.607
Advantage 7 — Emission Reduction (Additional Coal)%1,0022883.220960350.400
Advantage 8 — Total Coal Savings%6013.2004.818.00055.57920.286.316
GRAND TOTAL111.511 $40.729.205 $

Table 4 — Energy Savings Table

Savings Item%kW/DaykW/Year$/Day$/Year
5.6 — Units Reaching Full Load%9960.000350.400.00072.00026.280.000
Advantage 4 — Reduction in Internal Electricity Consumption%6,5702.000256.230.00052.65019.217.250
TOTAL ENERGY124.650 $45.497.250 $
236.161
$/Day — Total Savings
86,2M
$/Year — Total Savings
13.200
Tons/Day Coal Savings

When the 3,300 kCal/kg coal dried with Stinga Technology is used together with the 1,050 kCal/kg Kangal region mine coal to be blended with it, Kangal Thermal Power Plant will be able to operate continuously and without problems, with more efficient and higher production values. Such an application does not yet exist in thermal power plants using low-calorific, high-moisture lignite; this success has been achieved through Stinga pilot and industrial applications.

07
Section 7 — Technical Responses

Responses to Concerns Regarding the 3,300 kCal/kg Target

Section 1 — Adaptation of the Coal Mill to Stinga Technology

a) Coal Feed Control

Control of feeding dried coal into the boiler will be provided by taking data from the boiler temperature sensor (800–850°C). If there is no existing software, Stinga Technology's software will be added and coal feed control will be carried out.

b) No Modifications in Mills

No modifications will be made to the existing coal mills. Since 5 mills will operate at 68 tons/hour instead of 300 tons/hour, the energy load will decrease by 75%. With the project work, 2 of the 5 mills will remain active and spraying will continue from 24 centers; 3 mills will be taken out of service.

c) Combustion Chamber Volume Concern

The boiler combustion volume is designed for a capacity of 300 tons/hour and coal with 48% moisture. This moisture turns into steam in the combustion chamber and fills the volume. When the 3,300 kCal/kg coal dried at 135°C is sprayed into the boiler, the moisture vapor will turn into a fireball instead of moisture steam and fill the entire volume; heat transfer efficiency will increase.

d) ESP Load Reduction

By switching to a feed rate of 68 tons/hour, the load on the ESP will decrease by 75%. Since 75% less particulate matter will pass through the serpentine tubes, equipment life will be extended, and heat transfer will be maintained for longer without cleaning. The filter cleaning period will also extend by this ratio.

Section 2 — Control of Combustion Air

The boiler is designed for coal with 1,100 kCal/kg. As the coal's calorific value rises to 3,300 kCal/kg, each boiler will require 75% less fresh combustion air. The solution is to control combustion air by throttling the air using data from the existing fan's airflow sensor and oxygen sensor. The fan in the existing system is retained and only the control software is updated.

08
Long-Term Impact & Appendices

Coal Reserve Life: From 20 Years to 50 Years

50
Year

With current consumption: 22.000 tons/day × 365 = 160.600.000 tons / 20 years

With Stinga Technology: 8.800 tons/day × 365 = 3.212.000 tons/year

160.600.000 ÷ 3.212.000 = 50 years — Reserve life increases 2.5 times.

In addition, the existing 13.837.000 tons of low-calorific lignite reserves in the coal field will also be evaluated and incorporated into the system with the KKZ system.

Reference Documents and Appendices

🔬

APPENDIX-1 — TÜBİTAK MAM

Gebze Technical University Nano Energy Report: A scientific study confirming that coal whose moisture level has been reduced below the inherent moisture does not regain moisture again and does not exceed the inherent moisture level even if exposed to water.

📊

EK-2 — TKİ Seyit Ömer

Application report containing the analysis results of coal dried in the rotary kiln (Table 4). It shows that volatile gases do not decrease during drying; on the contrary, they increase proportionally with moisture removal.

🇺🇸

APPENDIX-3 — U.S. Patent

Stinga Technology Patent — United States of America. The U.S. patent document of Stinga Coal Drying and Enrichment Technology, registered in 134 countries in total.

🇷🇺

APPENDIX-4 — Russia Patent

Stinga Technology Patent — Russian Federation. If requested, all patent documents for a total of 134 countries can be provided.

Kangal Thermal Power Plant Electricity Generation Inc.
Kangal Thermal Power Plant EÜAŞ · 58901 Kangal / Sivas
Stinga Enerji A.Ş. — Şenol Özyaman
Konya Sugar Industry and Trade Inc.
Feasibility Study
Istanbul · February 2017
Visit: 31.01.2017

Total 134 Country Patents
USA · Russia · +132 Countries
Audio Reading
0:00 --:--
Speed:
01 / 01
⬇
AI
Our Services
Industrial Machine
Activated Carbon
Mining
Coal Drying
Wood Chips Drying
Bentonite Drying
Sewage Sludge Disposal
Poultry
Residential Heating