REACTIVE DRYING SYSTEM
MODEL: ST-2600-KRT
WASTE HEAT USE: 100%
EMISSIONS: NEAR-ZERO
Reactor
Top
Drying
An integrated drying system that uses the waste heat of the Stinga 2600 high-temperature reactor. It requires no external energy — the reactor's exhaust gas is your fuel.
Efficiency
Moisture
Capacity
Convert
Waste Heat
into Energy
The Stinga 2600 Reactor-Top Drying System directs the 150–380°C exhaust gases of the combustion reactor directly into the drying process. The annual fuel cost of conventional drying plants is reduced to zero.
For high-moisture raw materials — lignite, biomass, industrial sludge — the moisture content is reduced from 50% to below 12% before entering the reactor. This increases reactor efficiency, reduces exhaust emissions, and makes product quality consistent.
Integrated Drying in
4 Steps
Raw Material Input
High-moisture material is poured into the feed bunker. Moisture sensor readings are transmitted in real time.
Waste Heat Diversion
Reactor exhaust gas (150–380°C) is directed to the drum inlet. No extra fuel is burned.
Rotary Drum
Material slowly rotates in the drum. Moisture evaporates through contact with hot gas.
Dry Product Output
Moisture is measured at ≤12%. It is transferred to the reactor or to stock. The dust filter retains moisture from the exhaust.
Zero Additional Energy
No additional fuel or electricity is consumed for drying. All of the exhaust gas that is waste from the reactor is utilized.
Near-Zero Emission Increase
Since there is no new combustion source, the carbon footprint does not increase. With the dust filter, particulate emissions are kept below the legal limit.
Integrated Design
It is mounted modularly on top of or beside the reactor. Retrofit application to existing facilities is possible.
Smart Control
PLC-based automation continuously optimizes moisture sensors, temperature, and rotation speed parameters.
Low Maintenance
Wear surfaces are in an easily accessible modular structure. Annual planned maintenance time is under 48 hours.
Fast Return
With avoided fuel costs and increased reactor efficiency, the investment payback period is between 12–18 months.
Measurable
Results
All values are measured data documented under ISO 9001 at the Stinga test facility. A ±5% tolerance is applied according to site conditions.
Thermal Efficiency
Rate of transfer of exhaust heat to drying
Max. Capacity
Maximum processing rate for lignite
Additional Fuel
Amount of extra fuel included in the process
Output Moisture
Guaranteed maximum output moisture content
Max. Gas Temperature
Upper limit of exhaust gas entering the system
Payback Period
Average investment payback period
Full Integration with the Reactor
Pipe connections, control panel, and sensor network are delivered ready from the factory. On-site installation time is 5–7 working days.
Improves Reactor Efficiency
Material with low moisture content consumes less energy in the reactor; with the same fuel amount, 15%–22% more output is achieved.
Compatibility with Existing Facilities
Thanks to the retrofit module, adaptation to different reactor brands is also possible. Preliminary project engineering support is included.
Domestic Production
All components are produced in Türkiye. Spare part delivery time is 24–48 hours. No import dependency.
CE Marked & TSE Compliant
The system has the CE mark. It meets the limit values of Turkish environmental regulations, and support is provided during the environmental permit process.
Which Raw Materials
Can Be Dried?
Lignite & Hard Coal
Biomass & Agricultural Waste
Industrial Sludge
Ore & Mineral
Have the Calculation
Done
for Your Facility
We offer customized drying system design and payback period analysis based on the raw material moisture and your reactor capacity. Our engineering team responds within 48 hours.
Free Preliminary Project
If the existing plant layout and raw material analysis are shared, a feasibility report is prepared. No commitment required.
Turnkey Installation
From basic manufacturing to commissioning, the entire process is managed by the Stinga team.
2-Year Warranty
The system is covered by a 2-year workmanship and parts warranty from the commissioning date.
24/7 Technical Support
Fast response via remote connection in the event of operational issues. On-site service within 24 hours.