TR TR
Stinga Enerji A.Ş.
STINGA ENERJİ A.Ş.
REACTIVE DRYING SYSTEM
MODEL: ST-2600-KRT
Domestic Technology · 2024
DIAMETER: Ø2600mm
WASTE HEAT USE: 100%
EMISSIONS: NEAR-ZERO
Stinga Enerji — Drying Systems

Reactor
Top
Drying

An integrated drying system that uses the waste heat of the Stinga 2600 high-temperature reactor. It requires no external energy — the reactor's exhaust gas is your fuel.

≥94%Thermal
Efficiency
≤12%Output
Moisture
25t/hMax.
Capacity
Reactor Diameter
Ø 2600 mm
Drying Temperature
120 – 380 °C
Capacity Range
8 – 25 t/h
Moisture Reduction
%50 → %≤12
Additional Fuel Consumption
0 kcal/t
Technology

Convert
Waste Heat
into Energy

The Stinga 2600 Reactor-Top Drying System directs the 150–380°C exhaust gases of the combustion reactor directly into the drying process. The annual fuel cost of conventional drying plants is reduced to zero.

For high-moisture raw materials — lignite, biomass, industrial sludge — the moisture content is reduced from 50% to below 12% before entering the reactor. This increases reactor efficiency, reduces exhaust emissions, and makes product quality consistent.

Moisture Conversion — Raw Material Examples
Raw Lignite
%48
Dried
%10
Raw Biomass
%55
Dried
%12
Technical Specifications
Model
ST-2600-KRT
Reactor Diameter
Ø 2600 mm
Drum Length
12 – 18 m
Input Moisture (max.)
≤ %55
Output Moisture
≤ %12
Gas Temperature
120 – 380 °C
Capacity
8 – 25 t/h
Rotational Speed
0.8 – 3.5 rpm
Thermal Efficiency
≥ %94
Additional Fuel Consumption
0 kcal/t
Control System
PLC + HMI
Investment Payback
≤ 18 Months
Process Flow

Integrated Drying in
4 Steps

🪨

Raw Material Input

High-moisture material is poured into the feed bunker. Moisture sensor readings are transmitted in real time.

→
🔥

Waste Heat Diversion

Reactor exhaust gas (150–380°C) is directed to the drum inlet. No extra fuel is burned.

→
🌀

Rotary Drum

Material slowly rotates in the drum. Moisture evaporates through contact with hot gas.

→
✅

Dry Product Output

Moisture is measured at ≤12%. It is transferred to the reactor or to stock. The dust filter retains moisture from the exhaust.

⚡

Zero Additional Energy

No additional fuel or electricity is consumed for drying. All of the exhaust gas that is waste from the reactor is utilized.

🌿

Near-Zero Emission Increase

Since there is no new combustion source, the carbon footprint does not increase. With the dust filter, particulate emissions are kept below the legal limit.

📐

Integrated Design

It is mounted modularly on top of or beside the reactor. Retrofit application to existing facilities is possible.

🎛️

Smart Control

PLC-based automation continuously optimizes moisture sensors, temperature, and rotation speed parameters.

🔧

Low Maintenance

Wear surfaces are in an easily accessible modular structure. Annual planned maintenance time is under 48 hours.

💰

Fast Return

With avoided fuel costs and increased reactor efficiency, the investment payback period is between 12–18 months.

Performance Values

Measurable
Results

All values are measured data documented under ISO 9001 at the Stinga test facility. A ±5% tolerance is applied according to site conditions.

94%
Thermal Efficiency

Rate of transfer of exhaust heat to drying

25t/h
Max. Capacity

Maximum processing rate for lignite

0kcal
Additional Fuel

Amount of extra fuel included in the process

≤12%
Output Moisture

Guaranteed maximum output moisture content

380°C
Max. Gas Temperature

Upper limit of exhaust gas entering the system

18month
Payback Period

Average investment payback period

Why Stinga 2600?
🔗

Full Integration with the Reactor

Pipe connections, control panel, and sensor network are delivered ready from the factory. On-site installation time is 5–7 working days.

📊

Improves Reactor Efficiency

Material with low moisture content consumes less energy in the reactor; with the same fuel amount, 15%–22% more output is achieved.

🏗️

Compatibility with Existing Facilities

Thanks to the retrofit module, adaptation to different reactor brands is also possible. Preliminary project engineering support is included.

🇹🇷

Domestic Production

All components are produced in Türkiye. Spare part delivery time is 24–48 hours. No import dependency.

📋

CE Marked & TSE Compliant

The system has the CE mark. It meets the limit values of Turkish environmental regulations, and support is provided during the environmental permit process.

Application Areas

Which Raw Materials
Can Be Dried?

⛏️
Lignite & Hard Coal
Input Moisture
%30–55
Output Moisture
≤%10
Calorific Value Increase
+18–25%
Capacity
8–25 t/h
🌿
Biomass & Agricultural Waste
Input Moisture
%40–65
Output Moisture
≤%12
Applications
Pellets, briquettes
Capacity
6–18 t/h
💧
Industrial Sludge
Input Moisture
%70–85
Output Moisture
≤%25
Volume Reduction
%65–75
Capacity
4–12 t/h
🏭
Ore & Mineral
Input Moisture
%20–45
Output Moisture
≤%8
Examples
Bentonite, clay
Capacity
8–22 t/h
Request a Quote

Have the Calculation
Done
for Your Facility

We offer customized drying system design and payback period analysis based on the raw material moisture and your reactor capacity. Our engineering team responds within 48 hours.

📐
Free Preliminary Project

If the existing plant layout and raw material analysis are shared, a feasibility report is prepared. No commitment required.

🏭
Turnkey Installation

From basic manufacturing to commissioning, the entire process is managed by the Stinga team.

🛠️
2-Year Warranty

The system is covered by a 2-year workmanship and parts warranty from the commissioning date.

📞
24/7 Technical Support

Fast response via remote connection in the event of operational issues. On-site service within 24 hours.

Audio Reading
0:00 --:--
Speed:
01 / 01
⬇
AI
Our Services
Industrial Machine
Activated Carbon
Mining
Coal Drying
Wood Chips Drying
Bentonite Drying
Sewage Sludge Disposal
Poultry
Residential Heating